NINGBO MELONTEL COMMUNICATION EQUIPMENT Co.,Ltd

NINGBO MELONTEL COMMUNICATION EQUIPMENT Co.,Ltd

Manufacturer from China
Active Member
7 Years
Home / Products / Fiber Optic Closure /

MT-1522 China fiber optic 72 core closure with 2 clamp

Contact Now
NINGBO MELONTEL COMMUNICATION EQUIPMENT Co.,Ltd
City:ningbo
Province/State:zhejiang
Country/Region:china
Contact Person:MissDoris
Contact Now

MT-1522 China fiber optic 72 core closure with 2 clamp

Ask Latest Price
Video Channel
Brand Name :Melontel
Model Number :MT-1522
Certification :ISO9001:2008
Place of Origin :Zhejiang, China (Mainland)
MOQ :100 Piece/Pieces (Min. Order)
Price :US $10-50 / Pieces
Payment Terms :L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability :1000 Piece/Pieces per Day
Delivery Time :5 days
Packaging Details :1 PCS /BOX
Application :FTTH
Packing :1 pcs /box
Dimension :371*263*128mm
Capacity :72/144 core
Material :Strengthen Polymer Plastic
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Quick Details:

  • Place of Origin: Zhejiang, China (Mainland)
  • Brand Name: MELONTEL
  • Model Number: MT-1522
  • OEM: Weclome
  • Certification: ISO9001:2008
  • Usage: 20 year

Description:

Name : Fiber Optic Splice Closure
Country of origin : Ningbo,China
Dimension : 371*263*128mm
Capacity : 72/144 core
Material : Strengthen Polymer Plastic
Application : FTTH
Packing : 1 pcs/box
Color : Black
Warranty period : 20 year

Introduction:

Here I will outline the main steps involved in fiber splice closure installation. For more detailed steps, please follow the links in the author's bio section below.

1. Components in the closure

Fiber optic splice closure kit usually includes: end plate, splice tray organizer, fiber splice tray, cover, cable grommets, grommet retainer, mounting bracket and misc. hardware.

2. Fiber Cable Sheath Preparation

2.1 Expose the rip cord. This step involves mark the location with a tape marker, ring-cut the outer jacket with a sharp knife, remove the corrugated armor if applicable, and shave off the outer jacket to expose the rip cord.

2.2 Remove the outer sheath. This step involves make a longitudinal slit down the outer sheath, peel off the outer jacket and corrugated metal, can cut the rip cord flush with the end of the corrugated metal.

2.3 Remove the inner jacket. This step involves using the rip cord under the inner jacket to slit it, cut aramid yarns, cut central strength member, and clean the filling compound.

3. Bonding and Grounding Hardware Installation

Bond clamp installation. This step involves slide the cable clamp over sheath, slide the bond shoe under the corrugated metal, place the bond plate over the bond shoe and secure the sheath grip.

4. Assembly of Cables to Splice Closure

The preferable location for the two main cables is in the lower end plate port. If a third or fourth cable is required, it is easier to install it in the upper end plate port as a branch cable. This fiber optic splice closure is designed for two cables in each of its two ports. If only one cable will be installed in a port, the provided rubber grommet plug is used to substitute for the second cable.

4.1 Install Cables to End Plate. This step involves unscrew knob and remove grommet retainer, position the end plate assembly, attach the sheath grip to dielectric cables, slide cables and sheath grip through, and secure sheath grip to backbone.

4.2 Grommet Installation and External Grounding. This step involves apply B-sealant, push the grommets into the end plate port, and apply more B-Sealant.

4.3 Fiber Unit Preparation and Distribution Organizer Installation. This step involves remove more loose tubes, separate each cable's loose tube into two groups, position the distribution organizer, secure the loose tubes to the distribution organizer, and secure the loose tubes.

4.4 Splice Tray Installation. This step involves place the splice tray, fasten the end of the splice tray to the organizer, and install cables, grommets and external ground.

4.5 Optical Fiber Splicing. This step involves splice holder placing, fiber splicing and fasten the splice holder lid.

5. Fiber Optic Splice Closure Cover Installation

6. Closure Mounting

7. Reentry

Inquiry Cart 0